Perencanaan Pembangkit Listrik Tenaga Surya Kapasitas 54 kWP Off Grid Pulau Rani Desa Yamnaisu

Authors

  • Erwin Yusuf Politeknik Negeri Bandung
  • Jakariya Politeknik Negeri Bandung

Keywords:

PLTS Off-Grid, Pulau Rani, Energi Terbarukan, Simulasi, Elektrifikasi Daerah Terpencil

Abstract

This study presents the design of a 54 kWp off-grid Solar Power Plant (SPP) in Rani Island, Yamnaisu Village, Supiori Regency, Papua—an isolated region with limited access to the PLN electricity grid. The planning approach involved engineering design methods, including field surveys of electricity demand, solar irradiation potential, and technical specifications of solar panels and supporting components. Based on a daily energy demand of 199,394 Wh and a local solar potential of 3.707 kWh/kWp/day, the system was designed using 270 PV modules, 216 VRLA battery units, 18 Solar Charge Controllers (SCC), and 3 inverters. A performance simulation using PVsyst software showed an estimated annual energy production of 134 MWh, equivalent to a reduction of 63.9 tons of CO₂ emissions. The site plan and single line diagram demonstrate an efficient and secure configuration for areas with geographic challenges. The results confirm that the implementation of an off-grid SPP is an effective solution for rural electrification while contributing to the achievement of national renewable energy targets.

References

Al Hakim, R. R., Pangestu, A., Jaenul, A., Sinaga, D. W., Saputra, E. Y., & Arief, Y. Z. (2021). Implementasi Plts Di Desa Pulisan, Sulawesi Utara, Indonesia Sebagai Perwujudan Program Desa Energi. Prosiding Seminar Nasional Penelitian Dan Pengabdian 2021, “Penelitian Dan Pengabdian Inovatif Pada Masa Pandemi Covid-19,” 762–767.

Azizah, A. N., & Purbawanto, S. (2021). Perencanaan Pembangkit Listrik Tenaga Hibrid (Pv Dan Mikrohidro) Terhubung Grid. Jurnal Listrik, Instrumentasi Dan Elektronika Terapan, 2(1), 1.

Dedi Tri Laksono1*, Nofri Dodi2, Rien Afrianti3, R. S. H. (2024). Penggunaan Energi Terbarukan PLTS untuk Efisiensi Biaya dan Keberlanjutan Usaha Bubur Bayi Shashi di Bukittinggi Utilization. 2(3).

Harahap, P., Adam, M., & Oktrialdi, B. (2022). Optimasi Kapasitas Rooftop Pv Off Grid Energi Surya Berakselerasi di Tengah Pandemi Covid-19 untuk Diimplemtasikan pada Rumah Tinggal. RESISTOR (Elektronika Kendali Telekomunikasi Tenaga Listrik Komputer), 5(1), 31. https://doi.org/10.24853/resistor.5.1.31-38

Indonesia Minister of Energy and Mineral Resources. (2017). Pemanfaatan Sumber Energi TerbarukanUntuk Penyediaan Tenaga Listrik. 189, 1–22.

Jakariya, Jakariya, Bella Eliana, Dibyo Setiawan, R. A. (2024). Studi Pengaruh Pembebanan Variasi Media Filtrasi Terhadap Kinerja Motor Pompa 1 Fasa Pada Sistem Pengolahan Air Bersih. 6(2), 141–149.

Jakariya, J., Setiawan, D., & Dewadi, F. (2023). Pemakaian Peralatan K3 (Keselamatan Kesehatan Kerja) agar Tidak Terjadinya Kecelakaan Kerja. Jurnal Pengabdian Masyarakat Indonesia, 3(2), 281–286. https://doi.org/10.52436/1.jpmi.1032

Kastawan, I. M. W., Mudawari, A., Mursanto, W. B., Melkias, A. A., & Jakariya, J. (2024). Pelatihan instalasi PLTS rumah tangga Rooftop untuk siswa dan siswi Jurusan Teknik Instalasi Tenaga Listrik SMKN 6 Bandung. KACANEGARA Jurnal Pengabdian Pada Masyarakat, 7(1), 101–110.

Nainggolan, I. F., Windarta, J., & Sinaga, N. (2022). Perancangan PLTS Rooftop untuk Pemakaian Sendiri (PS) di PLTU Berau 2 × 7 MW. Jurnal Energi Baru Dan Terbarukan, 3(3), 187–200. https://doi.org/10.14710/jebt.2022.13442

Ode, L., Barata, A., & Efendi, R. (n.d.). Investigation of standalone photovoltaic-based energy harvesting : A case study in Kendari city , Southeast Sulawesi , Indonesia. 1–7.

Priharti, W., Kurniawan, E., & Silalahi, D. K. (2019). Penyuluhan Penggunaan Listrik dari Sumber Energi Surya Di Pesantren Al Mukarramah Kabupaten Bandung. ETHOS (Jurnal Penelitian Dan Pengabdian), 7(2), 355–361. https://doi.org/10.29313/ethos.v7i2.4743

Suweni Muntini, M., Putri Rahayu, L., Fatimah, I., Yuwana, L., & Indrawati, S. (2024). Implementasi Pemanfaatan Pembangkit Listrik Tenaga Surya (PLTS) untuk Peningkatan Produktivitas Budidaya Ikan dan Pertanian di Kalurahan Sumbersari. Jurnal Pengabdian Kepada Masyarakat, 02(02), 188–199.

Wasono, A., Karuniawan, E. A., Hardito, A., & ... (2024). Penerapan Rancang Bangun PLTS Sistem Off-Grid Sebagai Kendali Penyiraman Otomatis Berbasis PLC Pada Perkebunan Widuri di Desa Wonokerto, Kecamatan …. Jurnal Pengabdian …, 5(2), 1985–1989.

Windarta, J., Purnaweni, H., & Wardaya, A. Y. (2023). Pemanfaatan Teknologi Pembangkit Listrik Tenaga Surya (PLTS) di Desa Mojo Kecamatan Ulujami Kabupaten Pemalang. Jurnal Energi Baru Dan Terbarukan, 4(1), 7–14. https://doi.org/10.14710/jebt.2023.16965

Yusuf Yunus, M., Nauwir, H., Emiyanti Ali, G., Pangeran Muarif, A., Nurma Yunita, C., & Aldian, A. (2022). Rancang Bangun Plts Untuk Instalasi Pompa Air Di Pesantren Hidayatullah Tompobulu Kab. Maros. 302–307.

Published

2025-01-31

How to Cite

Yusuf, E., & Jakariya. (2025). Perencanaan Pembangkit Listrik Tenaga Surya Kapasitas 54 kWP Off Grid Pulau Rani Desa Yamnaisu . BULLET : Jurnal Multidisiplin Ilmu, 3(6), 905–915. Retrieved from https://www.journal.mediapublikasi.id/index.php/bullet/article/view/5396

Similar Articles

1 2 3 4 5 6 7 8 9 > >> 

You may also start an advanced similarity search for this article.